The contractor will install temporary mailboxes as determined by the Post Office and residents will be notified of their location. The existing mailbox will be salvaged until after construction and reinstalled in a similar location.
Trash pickup in the neighborhood will take place on the same day it currently occurs. The contractor will provide access to the neighborhood to garbage trucks for pickup, or coordinate with the disposal service providers during the occasional exception throughout the project to minimize inconvenience to the residents.